BEGIN:VCALENDAR VERSION:2.0 PRODID:-//ChamberMaster//Event Calendar 2.0//EN METHOD:PUBLISH X-PUBLISHED-TTL:P3D REFRESH-INTERVAL:P3D CALSCALE:GREGORIAN BEGIN:VEVENT DTSTART:20180828T130000Z DTEND:20180830T220000Z X-MICROSOFT-CDO-ALLDAYEVENT:FALSE SUMMARY:Vapor Distribution Systems 4.1- Duluth DESCRIPTION:4.1 Vapor Distribution Systems\n\n\n\nLayout\, Design and Selection on a Vapor Distribution System-\n\nAreas covered include using architectural and construction drawings\; determining system load and customer demand\; designing DOT (exchange and stationary) aboveground ASME and underground ASME installations\; determining proper corrosion protection for tanks/piping\; selecting regulators\, piping tubing\, vapor meters\, and estimating job costs. X-ALT-DESC;FMTTYPE=text/html:
4.1 Vapor Distribution Systems
\n
\nLayout\, Design and Selection on a Vapor Distribution System-
\nAreas covered include using architectural and construction drawings\; determining system load and customer demand\; designing DOT (exchange and stationary) aboveground ASME and underground ASME installations\; determining proper corrosion protection for tanks/piping\; selecting regulators\, piping tubing\, vapor meters\, and estimating job costs.